Interior refresh and update projects are focused finish-level improvements that bring a space up to date through selective material, tile, trim, fixture, and detail upgrades rather than full-scale reconstruction. Millwork refers to the finished wood elements in the home—trim, moldings, built-ins, paneling, and related custom carpentry details.
Throughout the home;
Removed mill work; trims, casings and fireplace surround. retained original 6 panel doors, jambs and cabinets.
Refresh
All original drywal wrapped window areas; new cap, head trim, fillet, jamb, side casing, verticle, sill and apron.
All doors; new cap, head trim, fillet and side casing
Cabinets; new paint and pulls
Shaw LVP flooring.
Replaced all solid surfaces with Blue Dunes Granite installed new fixtures.
Replace all lighting fixtures.
Utility Room Refresh
Living Room Refresh
Kitchen Refresh
Master Bedroom and Bath
Guest Bedrooms and Bath
Replace Laminate top and cast iron sink with new fabricated butcher block and indermount sink and faucet.
Added removable intert for sink area.
Added Back splash. Sealed with many coats ofOld Masters satin.
Before
After
After with insert
New Build Kitchen Backsplash
Showcasing craftsmanship in stone, steel, wood, and tile.
Some of the work shown represents past fabrication capabilities, along with the detail-driven tile and interior finish work that remains a current focus.